Productivity Enhancement of Robot by Man-machine Study
Keywords:
Teach pendant, Controller, SAP, Idle Time.Abstract
The man machine study is often used to exemplify the most productive way to use multiple operators, machines or any combination of people and machines. Man-machine time study is used to minimize idle operator/machine time, to optimize resources of operator and machines so that all the possible resources can utilized. The OEE also allows for drilling down for very specific analysis, such as a particular Part Number, Shift, or any of several other parameters. It is unlikely that any manufacturing process can run at 100% OEE. Many manufacturers benchmark their industry to set a challenging target; 85% is not uncommon.