A Case Study of Improvement in Productivity of a Machine by Fixture Design Modification with Simulation
Keywords:
Productivity, Fixture Design Modification, Simulation etc.Abstract
The thesis work is performed in Hero Motors limited Gaziabad, where state of art facilities are available and it provide clean, new ideas product design and latest technology. In this present thesis work 7.8% increase in productivity per month on the Tong Tai machine by just modifying the fixture design and decrease 32% manual time or13% machine time.
References
Downloads
Published
2018-10-31
Issue
Section
Articles
How to Cite
A Case Study of Improvement in Productivity of a Machine by Fixture Design Modification with Simulation. (2018). International Journal of Current Engineering and Technology, 8(5), 1333-1335. https://ijcet.evegenis.org/index.php/ijcet/article/view/1951
