1.
Minimizing the Rejection of Lever Combination Switch by removing the problem of Erratic continuity in Assembly line using Continuous Improvement Process. Int. J. Curr. Eng. Technol. [Internet]. 2015 Jun. 30 [cited 2026 Apr. 12];5(3):1802-7. Available from: https://ijcet.evegenis.org/index.php/ijcet/article/view/2233