“To Design a Continuous Gas Lift Method for Improving Production in a Dead Well: A Case Study”. International Journal of Current Engineering and Technology 10, no. 5 (October 31, 2020): 703–707. Accessed March 12, 2026. https://ijcet.evegenis.org/index.php/ijcet/article/view/1397.