“To Design a Continuous Gas Lift Method for Improving Production in a Dead Well: A Case Study”. International Journal of Current Engineering and Technology, vol. 10, no. 5, Oct. 2020, pp. 703-7, https://ijcet.evegenis.org/index.php/ijcet/article/view/1397.