[1]
“To Design a Continuous Gas Lift Method for Improving Production in a Dead Well: A Case Study”, Int. J. Curr. Eng. Technol., vol. 10, no. 5, pp. 703–707, Oct. 2020, Accessed: Mar. 12, 2026. [Online]. Available: https://ijcet.evegenis.org/index.php/ijcet/article/view/1397