[1]
“Balancing the Mixed Model Assembly Line for Minimizing Number of Stations, Cycle Time and Idle Time by Work Load Adjustment”, Int. J. Curr. Eng. Technol., vol. 6, no. 2, pp. 483–491, Apr. 2016, doi: 10.14741/.