1.
Minimizing the Rejection of Lever Combination Switch by removing the problem of Erratic continuity in Assembly line using Continuous Improvement Process. Int. J. Curr. Eng. Technol. 2015;5(3):1802-1807. Accessed April 11, 2026. https://ijcet.evegenis.org/index.php/ijcet/article/view/2233