(1)
Balancing the Mixed Model Assembly Line for Minimizing Number of Stations, Cycle Time and Idle Time by Work Load Adjustment. Int. J. Curr. Eng. Technol. 2016, 6 (2), 483-491. https://doi.org/10.14741/.